Home >

How To Draw Up The Construction Safety Agreement

2015/3/22 15:42:00 17

Construction SafetyAgreementTemplate

Construction safety agreement

Party A: Party A: it will be completed in the following years.

Address: the address is: the first, the second and the third.

The legal representative is the following: legal, deputy, and so on.

Authorized representative: the following are the representatives of the people's Republic of China.

Party B: the first party, the first, the second and the third.

Address: the address is: the first, the second and the third.

The legal representative is the following: legal, deputy, and so on.

Authorized representative: the following are the representatives of the people's Republic of China.

In accordance with the provisions of the Telecommunications Regulations of the People's Republic of China, the regulations on telecommunication construction and management, and the relevant laws and regulations of the "local telephone network user line engineering design standards" and other relevant laws and regulations, Party A and B have signed the agreement through consultation without consensus.

Article 1 both parties must abide by the laws and regulations concerning the safety of communication construction during the construction process, establish the responsibility system for safety construction, improve the conditions for safety construction, and ensure the safe construction in the process of line construction.

Second according to the needs of business development, Party B needs to carry out the following construction

1. address of Construction: construction, address, and location:

2. the distance from the line of the first party: it is the distance between the first and the second lines.

The 3. is the length of the construction.

Third in the above construction process, Party B must take the following safety measures to ensure the safety of the first party line.

1. overhead cables, optical cables and the original lines spanning, and the original line to cross the distance must reach the minimum clearance of 0.6M.

If 2. overhead cables and optical cables are crossed with power lines, the safe distance between them should conform to the relevant national standards and must be equipped with safety protection facilities.

Fourth article Division of responsibilities

In case of the same routing or cross over, the following parties shall be responsible by the responsible party.

If 1. overhead cables and optical cables are crossed with power lines, the safe distance between them should conform to the relevant national standards. At the same time, safety protection facilities must be installed. When the new one line and power line are crossed, there is no safety protection, strong electrical invasion will result in line failures and economic losses of the existing link roads, and the new party shall bear the responsibility.

2. the gap between the new square road and the original bar road is not in line with the national standard. If there is a phenomenon such as pole collapse, the damaged circuit will be interrupted. The new party is responsible for compensation for the loss. If the original bar pole has collapsed, the damage to the new pole will be caused, and both sides will bear the cost of the loss.

Fifth obligations of both parties

Party A and B have the obligation to inform the other party when they find the other side's line has problems.

Sixth rights of both parties

Both parties have the right to claim compensation for losses caused by the other party's responsibilities.

Seventh force majeure

Due to force majeure, Party A or party can not perform or fail to fulfill the relevant provisions of this agreement. obligation When the two parties are not liable for breach of contract. However, a force majeure party shall inform the other party within 5 working days after the occurrence of the force majeure, and provide proof of the relevant department. Within the reasonable time after the cancellation of the force majeure effect, one or both parties shall continue to carry out the agreement.

Eighth application of law and dispute resolution

This Agreement applies to People's Republic of China. Agency law Laws and regulations. Disputes arising from the execution of this Agreement shall be settled by friendly negotiation between the two parties. If negotiations fail, any party may submit the dispute to the communications bureau of the ",", ",", "," and "bu" provinces. The Provincial Bureau should make administrative decisions in accordance with the laws and regulations of the state, involving technical problems, invite relevant experts to demonstrate, and make arbitration. The above decision is binding on both parties.

Apart from the dispute, the two parties will continue to implement the agreement without dispute and other parts of the arbitration.

Ninth supplementary provisions

1. if any provision of this Agreement becomes unlawful, invalid or unenforceable at any time and does not fundamentally affect the validity of this agreement, other provisions of this Agreement shall not be affected.

2. neither party can alter or modify the agreement by itself without the written confirmation by both parties.

3. this agreement is made in 4 copies, each party holding 2 copies. The annex to this agreement is an integral part of this Agreement and has the same legal effect as this agreement.

4. all the notices relating to the execution of this agreement or any agreement with this Agreement shall be carried out in the form of written correspondence or by facsimile or similar communication confirmed by Party A and Party B in accordance with the address of this agreement. If a fax or similar communication is used, the date of notification is the date of issuance of the communication. If the express mail is used, the date of notification is the date of mailing, and the postmark shall prevail.

5. this Agreement shall come into force after signature by both parties and the official seal.

Party A (Gai Zhang): the second party is Gai Zhang.

Legal representative (signature): legal representative (signature):

This is the year of the year.


  • Related reading

建设工程廉洁协议如何拟定

Contract template
|
2015/3/21 20:39:00
10

How Best To Make A Pledge Contract?

Contract template
|
2015/3/20 19:06:00
22

资产置换协议该如何拟定

Contract template
|
2015/3/19 22:23:00
23

The Formulation Of Contract For Hotel Tourism Cooperation

Contract template
|
2015/3/18 15:57:00
16

The Formulation Of The Contract Of The Special Dealer

Contract template
|
2015/3/17 18:37:00
24
Read the next article

南京:大数据助推商标监管服务精准化

虽然地方政府高度重视、工商部门积极作为,为南京地区的商标事业提供了良好的发展环境,但由于过去有关商标发展的统计分析大多依靠传统手段,进而给商标事业的后续发展、监管带来一定的难度。